Package 1A: Infrastructure Development Work
The Package 1A project at DHA Gujranwala focuses on developing critical infrastructure for Entrance 2 and the Main Boulevard. This project is a vital component of the overall master plan, designed to enhance accessibility and create a grand entry point.
Scope of Work:
Main Boulevard Construction: A state-of-the-art boulevard with multiple lanes, modern street lighting, and landscaped medians.
Entrance 2 Development: Aesthetic and functional entrance with wide access roads, advanced security checkpoints, and a grand entrance plaza.
Utility Infrastructure: Laying essential utility infrastructure, including water supply lines, sewage systems, and electrical conduits.
Impact:
This project sets the tone for the entire development, providing a lasting first impression that resonates with residents and visitors. The Main Boulevard and Entrance 2 are designed to provide smooth access, elevate the overall experience, and reflect the prestige of the DHA brand.